USH 61-PINE ST over BAKER CREEK

1.5M N JCT CTH H · County 023, Wisconsin · Built 2011 · 2 Lanes · 2,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B12007700000000
Year Built
2011
Length
25.7 m (84.3 ft)
Max Span
24.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.