CTH C over JOHNSON VALLEY CREEK

0.8M W JCT STH 131 · County 023, Wisconsin · Built 2017 · 2 Lanes · 360 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B12018100000000
Year Built
2017
Length
15.4 m (50.5 ft)
Max Span
14.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
360
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.