USH 61 over BAKER CREEK

0.8M N JCT CTH X · County 023, Wisconsin · Built 1960 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B12002200000000
Year Built
1960
Length
9.5 m (31.2 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
2,300
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.