STH 29 EB -STH 73 over BLACK RIVER

0.8M E JCT CTH O · County 019, Wisconsin · Built 1961 · 2 Lanes · 6,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B10001900000000
Year Built
1961
Reconstructed
1996
Length
98.8 m (324.1 ft)
Max Span
37.8 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
6,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.