LRD BAIRD STREET over EAST RIVER

0.1M S JCT STH 29 · County 009, Wisconsin · Built 1984 · 4 Lanes · 13,268 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B05027500000000
Year Built
1984
Length
36.9 m (121.1 ft)
Max Span
35.7 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
13,268
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$587,000
Total Project Cost
$881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.