STH 54-STH 57-MONR over EAST RIVER

0.1M E JCT STH 29 TO E · County 009, Wisconsin · Built 1984 · 6 Lanes · 16,791 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B05025500000000
Year Built
1984
Length
61.4 m (201.4 ft)
Max Span
31.2 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
16,791
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.