STH 54 WB ON RAMP over STH 57-MONROE ST

0.5M W JCT STH 29 TO W · County 009, Wisconsin · Built 1973 · 1 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B05013400250000
Year Built
1973
Length
104.9 m (344.2 ft)
Max Span
27.9 m
Width
6.5 m (21.3 ft)
Lanes
1
Daily Traffic
2,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,745,000
Total Project Cost
$2,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.