CTH X over EAST RIVER
0.8M W JCT CTH GV · County 009, Wisconsin · Built 1982 · 2 Lanes · 6,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
44.423433, -88.041608
This bridge is in worse condition than 96.6% of bridges in County 009. The average bridge in Wisconsin is 0 years old; this one is 44 years old.
Nearby Bridges
LRD CREAMERY ROAD over BRANCH EAST RIVER
Built 2018
LRD SWAN ROAD over BR EAST RIVER
Built 1995
LRD LEDGEVIEW RD over EAST RIVER
Built 1978
STH 32 NB-STH 57 N over CTH PP
Built 2023
CTH G over EAST RIVER
Built 2001
STH 32-STH 57 over CMSTPP RR
Built 1962
CTH PP over EAST RIVER
Built 1987
CTH G/CHICAGO ST. over TRIBUTARY TO E RIVER FLO
Built 2016
LRD OLD MARTIN ROA over EAST RIVER
Built 1979
CTH GV/MONROE RD. over EAST RIVER TRIBUTARY
Built 2012
Bridge Details
- Structure #
- B05026700000000
- Year Built
- 1982
- Length
- 23.1 m (75.8 ft)
- Max Span
- 22.6 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 6,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $343,000
- Total Project Cost
- $514,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.