CTH G/CHICAGO ST. over TRIBUTARY TO E RIVER FLO
0.1M E OF CTH GV · County 009, Wisconsin · Built 2016 · 2 Lanes · 4,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.431778, -88.01375
This bridge is in worse condition than 83.3% of bridges in County 009. The average bridge in Wisconsin is 0 years old; this one is 10 years old.
Nearby Bridges
CTH GV/MONROE RD. over EAST RIVER TRIBUTARY
Built 2012
CTH G over EAST RIVER
Built 2001
LRD BRAYDEN LANE over UNNAMED CREEK
Built 2020
LRD BRAYDEN LANE over UNNAMED CREEK
Built 2021
CTH GV/MONROE RD. over EAST RIVER TRIBUTARY
Built 2012
LRD LEDGEVIEW RD over EAST RIVER
Built 1978
LRD CREAMERY ROAD over BRANCH EAST RIVER
Built 2018
CTH GV/MONROE RD. over BOWER CREEK TRIBUTARY
Built 2012
LRD SWAN ROAD over BR EAST RIVER
Built 1995
LRD BOWER CREEK RD over BR BOWER CREEK
Built 1970
Bridge Details
- Structure #
- B05041200000000
- Year Built
- 2016
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 4,700
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.