STH 32 NB-STH 57 N over CTH PP
4.8M N JCT CTH ZZ TO W · County 009, Wisconsin · Built 2023 · 1 Lanes · 2,800 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.434492, -88.059172
This bridge is in worse condition than 26.6% of bridges in County 009. The average bridge in Wisconsin is 0 years old; this one is 3 years old.
Nearby Bridges
STH 32-STH 57 over CMSTPP RR
Built 1962
STH 32 over FOX RIVER
Built 2007
LRD SWAN ROAD over BR EAST RIVER
Built 1995
CTH X over EAST RIVER
Built 1982
LRD CREAMERY ROAD over BRANCH EAST RIVER
Built 2018
LRD LEDGEVIEW RD over EAST RIVER
Built 1978
CTH G over EAST RIVER
Built 2001
LRD GLORY RD over ASHWAUBENON CREEK
Built 2010
IH 41 NB over CTH EE
Built 2013
IH 41 SB over CTH EE
Built 2013
Bridge Details
- Structure #
- B05046500000000
- Year Built
- 2023
- Length
- 73.3 m (240.5 ft)
- Max Span
- 29.3 m
- Width
- 9 m (29.5 ft)
- Lanes
- 1
- Daily Traffic
- 2,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,241,000
- Total Project Cost
- $1,861,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.