I-79 SBL over CR 29

2.33 MILES SOUTH OF CR 29 · County 087, West Virginia · Built 1972 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000044A133
Year Built
1972
Length
42.1 m (138.1 ft)
Max Span
18.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$560,000
Total Project Cost
$561,000