I-79 NBL over CR 29

2.33 MILE SOUTH OF CR 29 · County 087, West Virginia · Built 1972 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000044A122
Year Built
1972
Length
48.5 m (159.1 ft)
Max Span
18.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$715,000
Total Project Cost
$716,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.