I-79 NBL over CO 29

8.54 MI SOUTH OF WV 36 · County 087, West Virginia · Built 1972 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000044A123
Year Built
1972
Length
44.7 m (146.7 ft)
Max Span
19.2 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.