PROJECT AND PUBLIC over THE DALLES DAM
NORTH ACCESS BR OVER SP&S · County 039, Washington · Built 1956 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
45.615086, -121.141575
This bridge is in worse condition than 93.4% of bridges in County 039. The average bridge in Washington is 0 years old; this one is 70 years old.
Nearby Bridges
US 197 over COLUMBIA R SP & S RY
Built 1954
US 197 (HWY 004) over COLUMBIA RIVER
Built 1954
I-84 (HWY 002) over UPRR
Built 1964
I-84 (HWY 002) over THREE MILE CREEK
Built 2016
I-84 (HWY 002) over FIFTEEN MILE CREEK
Built 2010
VIEWPOINT ROAD over FIFTEEN MILE CREEK
Built 1919
US 197 (HWY 004) over UPRR & FRONTAGE RD
Built 1954
US 197 (HWY 004) over HWY 002
Built 1964
HWY 292 over THREE MILE CREEK
Built 2003
PROJECT AND PUBLIC over THE DALLES DAM
Built 1954
Bridge Details
- Structure #
- CEPNPPWA000TD06
- Year Built
- 1956
- Length
- 33.4 m (109.6 ft)
- Max Span
- 11.7 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $284,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.