MAINTENANCE ROAD over WEST CANAL

West Canal Lateral 35.9D · County 025, Washington · Built 1968 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
11WC0231
Year Built
1968
Length
9.2 m (30.2 ft)
Max Span
8.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
30
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Reclamation
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.