Cresent Bar Rd over Wanapum Lake

Cresent Bar · County 025, Washington · Built 2008 · 2 Lanes · 1,147 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
087579000000000
Year Built
2008
Length
39.6 m (129.9 ft)
Max Span
39.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,147
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,527,000
Total Project Cost
$5,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.