SR 28 over IRRIGATION CANAL
4.5 E DOUGLAS CO · County 025, Washington · Built 1952 · 2 Lanes · 10,968 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
47.232614, -119.929747
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 74 years old.
Nearby Bridges
U.7 over USBR Lateral
Built 1954
S NW over IRRIGATION CANAL
Built 2004
S RD NW over IRRIGATION LATERAL
Built 1952
MAINTENANCE ROAD over WEST CANAL
Built 1968
9 RD NW over IRRIGATION LATERAL
Built 1953
S RD NW over IRRIGATION LATERAL
Built 1953
9 RD NW over IRRIGATION LATERAL
Built 1952
8 RD NW over WEST CANAL
Built 1953
R RD NW over LAT. BLK 73
Built 1995
BAIRD SPRINGS RD over Trinidad Creek
Built 2005
Bridge Details
- Structure #
- 000000MD0000000
- Year Built
- 1952
- Length
- 17.4 m (57.1 ft)
- Max Span
- 16.5 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 10,968
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $542,000
- Total Project Cost
- $1,083,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.