S RD NW over IRRIGATION LATERAL
S NW 0.4 North of SR 28 · County 025, Washington · Built 1952 · 2 Lanes · 786 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.239064, -119.896628
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 74 years old.
Nearby Bridges
S NW over IRRIGATION CANAL
Built 2004
R RD NW over LAT. BLK 73
Built 1995
11 ROAD NW over LAT. BLK 73
Built 1952
9 RD NW over IRRIGATION LATERAL
Built 1953
9 RD NW over IRRIGATION LATERAL
Built 1952
S RD NW over IRRIGATION LATERAL
Built 1953
SR 28 over IRRIGATION CANAL
Built 1952
Martin Rd over WASTEWAY
Built 1952
Q - NW over IRRIGATION CANAL
Built 2003
SR 281 over WEST CANAL
Built 1950
Bridge Details
- Structure #
- 081375000000000
- Year Built
- 1952
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.2 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 786
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $193,000
- Total Project Cost
- $386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.