SE 4TH PL over Kelsey Creek

Kelsey Ck Park Enterance · County 033, Washington · Built 2008 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
089508000000000
Year Built
2008
Length
12.9 m (42.3 ft)
Max Span
11.9 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
100
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Local Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$942,000
Total Project Cost
$1,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.