SR 529 over SNOHOMISH RIVER

4.6 N JCT SR 529 SPUR · County 061, Washington · Built 1927 · 2 Lanes · 16,286 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
0000965A0000000
Year Built
1927
Reconstructed
1994
Length
816.9 m (2680.1 ft)
Max Span
54.9 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
16,286
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,368,000
Total Project Cost
$40,736,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.