SR 529 over UNION SL

5.9 N JCT SR 529 SPUR · County 061, Washington · Built 1927 · 2 Lanes · 16,439 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 4 Poor
Substructure 4 Poor

Location

48.030958, -122.182775

This bridge is in worse condition than 96% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 99 years old.

Nearby Bridges

Bridge Details

Structure #
0000965B0000000
Year Built
1927
Length
177.1 m (581 ft)
Max Span
15.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
16,439
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,140,000
Total Project Cost
$8,279,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.