SR 529 over UNION SL

5.9 N JCT SR 529 SPUR · County 061, Washington · Built 1954 · 2 Lanes · 16,439 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
0004562A0000000
Year Built
1954
Length
192.9 m (632.9 ft)
Max Span
18.9 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
16,439
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,412,000
Total Project Cost
$10,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.