SR 529 over BNRR

1.5 N JCT SR 529 SPUR · County 061, Washington · Built 1991 · 4 Lanes · 13,991 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
085900000000000
Year Built
1991
Length
192.3 m (630.9 ft)
Max Span
32.9 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
13,991
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,240,000
Total Project Cost
$22,479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.