I-5 over US 2 EB/HEWITT AVE
1.1 N JCT SR 529 · County 061, Washington · Built 1966 · 4 Lanes · 62,161 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.979086, -122.189897
This bridge is in worse condition than 11.2% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
I-5 over US 2 EB/HEWITT AVE
Built 1966
US 2 RAMP over HEWITT AVENUE
Built 2006
US 2 over W-N RAMP EVERETT AVE
Built 1966
I-5 over W-S W-W S-E RAMPS
Built 1967
I-5 over SR 529 - PACIFIC AVE
Built 1966
I-5 over SR 529 / PACIFIC AVE
Built 1966
I-5 over W-S W-W S-E RAMPS
Built 1967
SR 529 SPUR over I-5 S-E RAMP
Built 1967
I-5 over SR 529 SPUR/EVERETT AVE
Built 1966
I-5 over SR 529 SPUR/EVERETT AVE
Built 1966
Bridge Details
- Structure #
- 0007888F0000000
- Year Built
- 1966
- Reconstructed
- 2007
- Length
- 35.1 m (115.2 ft)
- Max Span
- 33.8 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 62,161
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,884,000
- Total Project Cost
- $3,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.