I-5 over SR 529 SPUR/EVERETT AVE

0.1 N JCT US 2 · County 061, Washington · Built 1966 · 4 Lanes · 62,161 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007888G0000000
Year Built
1966
Reconstructed
2007
Length
39 m (128 ft)
Max Span
37.8 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
62,161
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,098,000
Total Project Cost
$4,195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.