MONROE ROAD over W. BRANCH DRAGOON CREEK

0.9 MI N. STALEY ROAD · County 063, Washington · Built 2018 · 2 Lanes · 1,092 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
089009000000000
Year Built
2018
Length
23.2 m (76.1 ft)
Max Span
22.5 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,092
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$1,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.