US 395 over DRAGOON CR

13.4 N JCT US 395 SPUR · County 063, Washington · Built 1951 · 2 Lanes · 11,508 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0004029A0000000
Year Built
1951
Reconstructed
1998
Length
26.8 m (87.9 ft)
Max Span
10.4 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
11,508
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,128,000
Total Project Cost
$2,257,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.