CRESCENT ROAD over DRAGOON CREEK

1.0 S CHATTEROY · County 063, Washington · Built 1986 · 2 Lanes · 92 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
084493000000000
Year Built
1986
Length
23.8 m (78.1 ft)
Max Span
23.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
92
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$630,000
Total Project Cost
$1,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.