Nookachamp Hills over Otter Pond Creek

0.75 E JCT SR 9 · County 057, Washington · Built 2008 · 2 Lanes · 470 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
088374000000000
Year Built
2008
Length
9.4 m (30.8 ft)
Max Span
8.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
470
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000
Total Project Cost
$440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.