TAYLOR ROAD over WALKER CREEK
4.3 E JCT SR 9 · County 057, Washington · Built 1985 · 1 Lanes · 40 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.410369, -122.211692
This bridge is in worse condition than 8.6% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 41 years old.
Nearby Bridges
BEAVER LAKE RD over NOOKACHAMPS CREEK
Built 1977
Nookachamp Hills over Otter Pond Creek
Built 2008
SR 9 over W FK NOOKACHAMPS CREEK
Built 1952
LAKE VIEW BLVD over NOOKACHAMPS CREEK
Built 1954
KNAPP ROAD over NOOKACHAMPS CREEK
Built 1977
SR 9 over W FK NOOKACHAMPS CR
Built 1920
J STREET over UNNAMED CREEK
Built 2006
BEAVER POND DR S over GC CREEK
Built 2004
BEAVER POND DR N over UNNAMED CREEK
Built 2002
OLYMPIC LANE over GC CREEK
Built 2004
Bridge Details
- Structure #
- 084020000000000
- Year Built
- 1985
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 40
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $642,000
- Total Project Cost
- $1,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.