TAYLOR ROAD over WALKER CREEK

4.3 E JCT SR 9 · County 057, Washington · Built 1985 · 1 Lanes · 40 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084020000000000
Year Built
1985
Length
12.8 m (42 ft)
Max Span
12.2 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
40
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$642,000
Total Project Cost
$1,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.