OLYMPIC LANE over GC CREEK

0.02 JCT BEAVER POND DR N · County 057, Washington · Built 2004 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
087600000000000
Year Built
2004
Length
20.5 m (67.3 ft)
Max Span
20.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$384,000
Total Project Cost
$767,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.