CONRAD ROAD over SUTTER CREEK

0.59 E JCT SR20 · County 057, Washington · Built 2011 · 1 Lanes · 23 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088329000000000
Year Built
2011
Length
22.3 m (73.2 ft)
Max Span
20.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
23
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$347,000
Total Project Cost
$694,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.