CONRAD ROAD over SWIFT CREEK

0.2 E JCT SR 20 · County 057, Washington · Built 1981 · 2 Lanes · 23 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
084039000000000
Year Built
1981
Length
11.9 m (39 ft)
Max Span
11.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
23
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$241,000
Total Project Cost
$482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.