SR 530 over SKAGIT RIVER
14.5 N SNOHOMISH CO · County 057, Washington · Built 1961 · 2 Lanes · 1,475 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
48.485286, -121.5933
This bridge is in worse condition than 39.8% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 65 years old.
Nearby Bridges
SR 530 over BOHS SLOUGH
Built 1961
CONRAD ROAD over SWIFT CREEK
Built 1981
SR 20 over SWIFT CREEK
Built 1955
CONRAD ROAD over SUTTER CREEK
Built 2011
SR 20 over UNNAMED TRIBUTARY
Built 2024
CONCRETE-SAUK VLY over MILLER CREEK
Built 1999
CONC-SAUK VALLEY over NORTH OSTERMAN CK
Built 2021
SR 20 over GULCH
Built 1953
ROCKPORT CASCADE R over ILLABOT CREEK (WEST)
Built 2018
ROCKPORT CASCADE over ILLABOT CREEK (MIDDLE)
Built 2018
Bridge Details
- Structure #
- 000000QY0000000
- Year Built
- 1961
- Length
- 154.2 m (505.9 ft)
- Max Span
- 53.9 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,475
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,846,000
- Total Project Cost
- $7,691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.