D Road SE over Irrigation Canal
D SE .9 mile S of 13 SE · County 025, Washington · Built 2009 · 2 Lanes · 391 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.883811, -119.410833
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 17 years old.
Nearby Bridges
E RD SE over IRRIGATION LATERAL
Built 1954
F RD SE over IRRIGATION LATERAL
Built 1954
E RD SE over WEST CANAL
Built 1960
C RD SE over WEST CANAL
Built 1964
B RD SE over IRRIGATION CANAL
Built 1953
SR 26 over LOWER CRAB CREEK
Built 1955
SR 262 over LAT. WG1J BLK 80
Built 1990
B SE over Crab Creek
Built 1950
B SE over Irrigation canal
Built 1950
MCMANAMON RD over Lower Crab Creek
Built 2001
Bridge Details
- Structure #
- 087989000000000
- Year Built
- 2009
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.4 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 391
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $848,000
- Total Project Cost
- $1,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.