B SE over Crab Creek

B SE 2.1 mile S of SR 26 · County 025, Washington · Built 1950 · 1 Lanes · 36 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
089394000000000
Year Built
1950
Reconstructed
2023
Length
18.5 m (60.7 ft)
Max Span
18.5 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
36
Material
Steel Continuous
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$873,000
Total Project Cost
$1,746,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.