MCMANAMON RD over Lower Crab Creek
00.06 MI NW SOLBECK RD · County 001, Washington · Built 2001 · 2 Lanes · 1,024 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.895717, -119.303822
This bridge is in worse condition than 4.3% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 25 years old.
Nearby Bridges
H ROAD SE over WEST CANAL BLK 80
Built 1953
F RD SE over IRRIGATION LATERAL
Built 1954
E RD SE over IRRIGATION LATERAL
Built 1954
E RD SE over WEST CANAL
Built 1960
D Road SE over Irrigation Canal
Built 2009
MAINTENANCE ROAD over POTHOLES CANAL
Built 1950
MORGAN LAKE ROAD over POTHOLES CANAL
Built 2002
SR 26 over LOWER CRAB CREEK
Built 1955
SR 262 over OSULLIVAN DAM OUTLET
Built 1973
C RD SE over WEST CANAL
Built 1964
Bridge Details
- Structure #
- 086631000000000
- Year Built
- 2001
- Length
- 30.2 m (99.1 ft)
- Max Span
- 29.9 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,024
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $957,000
- Total Project Cost
- $1,126,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.