SUNSHINE RD/9080 over PARADISE CREEK
.07 MI S SR 270 · County 075, Washington · Built 2007 · 2 Lanes · 503 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.7306, -117.088017
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 19 years old.
Nearby Bridges
ODONNELL/5570 over MISSOURI FLAT CREEK
Built 1976
ACCESS ROAD over PARADISE CREEK
Built 1953
SAND/9060 over SOUTH FORK PALOUSE RIVER
Built 2005
BLUE HERON LANE over S.FK.PALOUSE RIVER
Built 2000
STC7684;SAND ROAD over S.FK.PALOUSE RIVER
Built 1971
SAND ROAD over S.FK.PALOUSE RIVER
Built 1955
STADIUM DR over PARADISE CREEK
Built 2010
STC 7704;PERIMETER over PARADISE CREEK
Built 1953
STADIUM DR over PARADISE CREEK
Built 2010
SAND/9060 over SOUTH FORK PALOUSE RIVER
Built 2017
Bridge Details
- Structure #
- 087547000000000
- Year Built
- 2007
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.7 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 503
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,986,000
- Total Project Cost
- $3,971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.