SAND/9060 over SOUTH FORK PALOUSE RIVER
6.43MI NE JOHNSON · County 075, Washington · Built 2005 · 2 Lanes · 624 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.70065, -117.0414
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 21 years old.
Nearby Bridges
BLUE HERON LANE over S.FK.PALOUSE RIVER
Built 2000
STC7684;SAND ROAD over S.FK.PALOUSE RIVER
Built 1971
SAND ROAD over S.FK.PALOUSE RIVER
Built 1955
SAND/9060 over UNNAMED DRAINAGE
Built 1976
CONESTOGA DRIVE over S FK PALOUSE R(EDINGTON)
Built 2024
US 95 over S.FK. PALOUSE RIVER
Built 2004
SAND/9060 over SOUTH FORK PALOUSE RIVER
Built 2017
ACCESS ROAD over PARADISE CREEK
Built 1953
PARADISE CRK ST over PARADISE CREEK
Built 1967
STADIUM DR over PARADISE CREEK
Built 2010
Bridge Details
- Structure #
- 087330000000000
- Year Built
- 2005
- Length
- 25 m (82 ft)
- Max Span
- 24.4 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 624
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,660,000
- Total Project Cost
- $3,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.