PARADISE CRK ST over PARADISE CREEK
IN MOSCOW @ U OF I · County 057, Idaho · Built 1967 · 2 Lanes · 4,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.731192, -117.015036
This bridge is in worse condition than 46.2% of bridges in County 057. The average bridge in Idaho is 0 years old; this one is 59 years old.
Nearby Bridges
STADIUM DR over PARADISE CREEK
Built 2010
STADIUM DR over PARADISE CREEK
Built 2010
STC 7704;PERIMETER over PARADISE CREEK
Built 1953
STC 7834;LINE ST over PARADISE CREEK
Built 2010
STC 7664;W. 6TH ST over PARADISE CREEK
Built 1916
ACCESS ROAD over PARADISE CREEK
Built 1953
COLLEGE STREET over PARADISE CREEK
Built 1915
US 95 over PARADISE CREEK
Built 2000
CONESTOGA DRIVE over S FK PALOUSE R(EDINGTON)
Built 2024
SAND ROAD over S.FK.PALOUSE RIVER
Built 1955
Bridge Details
- Structure #
- 000000000029750
- Year Built
- 1967
- Length
- 323.4 m (1061 ft)
- Max Span
- 11.3 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $9,454,000
- Total Project Cost
- $14,181,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.