JOHNSON/9050 over STALEY CREEK
4.18 MI. SW SR 270 · County 075, Washington · Built 2007 · 2 Lanes · 156 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.672833, -117.1321
This bridge is in worse condition than 9.5% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 19 years old.
Nearby Bridges
STALEY/9030 over STALEY CREEK
Built 1922
JOHNSON/9050 over SOUTH FORK PALOUSE RIVER
Built 1965
JENNINGS/9100 over SOUTH FORK PALOUSE RIVER
Built 1914
STALEY/9030 over STALEY CREEK
Built 1971
SAND/9060 over SOUTH FORK PALOUSE RIVER
Built 2017
CHAMBERS/9620 over DRAINAGE CHANNEL
Built 1958
BISHOP BLVD over S FORK PALOUSE RIVER
Built 1992
SAND/9060 over UNNAMED DRAINAGE
Built 1976
BISHOP BLVD over PARADISE CREEK
Built 1985
SOUTH ST over S FORK PALOUSE RIVER
Built 1982
Bridge Details
- Structure #
- 087542000000000
- Year Built
- 2007
- Length
- 27.4 m (89.9 ft)
- Max Span
- 26.7 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 156
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,805,000
- Total Project Cost
- $3,610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.