BISHOP BLVD over PARADISE CREEK

0.2 S JCT SR 270 · County 075, Washington · Built 1985 · 3 Lanes · 15,937 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
085038000000000
Year Built
1985
Length
11.3 m (37.1 ft)
Max Span
11 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
15,937
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,116,000
Total Project Cost
$2,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.