SOUTH ST over S FORK PALOUSE RIVER

0.2MI W 270&STADWAY · County 075, Washington · Built 1982 · 2 Lanes · 1,004 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
085035000000000
Year Built
1982
Length
25 m (82 ft)
Max Span
24.7 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
1,004
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$546,000
Total Project Cost
$1,091,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.