BAUER RD over DRY WASH
02.27 MI N ROSENOFF · County 001, Washington · Built 2000 · 2 Lanes · 15 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.165717, -118.451878
This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 26 years old.
Nearby Bridges
SCHOESSLER RD over DRY WASH
Built 1900
PAHA-PACKARD RD. over DRY WASH
Built 1915
ROSENOFF RD over BAUER COULEE
Built 1995
DIVISION STREET over PAHA DRAINAGE DITCH
Built 1930
CHELAN STREET over PAHA DRAINAGE DITCH
Built 1987
I-90 over N PAHA PACKARD RD
Built 1972
I-90 over PAHA COULEE
Built 1959
I-90 over N PAHA PACKARD RD
Built 1972
PAHA-PACKARD RD over DRY WASH
Built 1915
BAUMAN RD. over INTERMITTENT STREAM
Built 1900
Bridge Details
- Structure #
- 086548000000000
- Year Built
- 2000
- Length
- 12.2 m (40 ft)
- Max Span
- 11.3 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 15
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.