I-90 over PAHA COULEE
13.1 E JCT SR 21 · County 001, Washington · Built 1959 · 4 Lanes · 6,150 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
47.11135, -118.408953
This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
E-NS RAMP I-90 over BURLINGTON-NORTHERN RR
Built 1985
US 395 SB over N-N RAMP
Built 1996
US 395 NB over N-N RAMP
Built 1996
HEINEMAN RD over DRY WASH
Built 1995
US 395 RAMP over I-90
Built 1958
I-90 over US 395 SB
Built 1996
I-90 over US 395 SB
Built 1995
DIVISION STREET over PAHA DRAINAGE DITCH
Built 1930
CHELAN STREET over PAHA DRAINAGE DITCH
Built 1987
I-90 over SR 261
Built 1958
Bridge Details
- Structure #
- 002000620000000
- Year Built
- 1959
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 6,150
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $345,000
- Total Project Cost
- $690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.