HEINEMAN RD over DRY WASH
00.20 MI W SR 395 · County 001, Washington · Built 1995 · 2 Lanes · 71 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.103358, -118.412269
This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 31 years old.
Nearby Bridges
I-90 over PAHA COULEE
Built 1959
US 395 SB over N-N RAMP
Built 1996
US 395 NB over N-N RAMP
Built 1996
E-NS RAMP I-90 over BURLINGTON-NORTHERN RR
Built 1985
US 395 RAMP over I-90
Built 1958
I-90 over US 395 SB
Built 1996
I-90 over US 395 SB
Built 1995
URQUHART RD over US 395
Built 1995
DIVISION STREET over PAHA DRAINAGE DITCH
Built 1930
I-90 over SR 261
Built 1958
Bridge Details
- Structure #
- 083748000000000
- Year Built
- 1995
- Length
- 7.7 m (25.3 ft)
- Max Span
- 7.5 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 71
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $639,000
- Total Project Cost
- $1,278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.