SCHOESSLER RD over DRY WASH
00.5 MI W BAUER RD · County 001, Washington · Built 1900 · 2 Lanes · 8 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
47.161867, -118.463433
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 126 years old.
Nearby Bridges
BAUER RD over DRY WASH
Built 2000
PAHA-PACKARD RD. over DRY WASH
Built 1915
ROSENOFF RD over BAUER COULEE
Built 1995
I-90 over N PAHA PACKARD RD
Built 1972
I-90 over N PAHA PACKARD RD
Built 1972
DIVISION STREET over PAHA DRAINAGE DITCH
Built 1930
I-90 over PAHA COULEE
Built 1959
PAHA-PACKARD RD over DRY WASH
Built 1915
CHELAN STREET over PAHA DRAINAGE DITCH
Built 1987
E-NS RAMP I-90 over BURLINGTON-NORTHERN RR
Built 1985
Bridge Details
- Structure #
- 080529000000000
- Year Built
- 1900
- Reconstructed
- 1938
- Length
- 7 m (23 ft)
- Max Span
- 3.4 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 8
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $596,000
- Total Project Cost
- $1,191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.