RIVERSIDE DR over DILLENBAUGH CREEK

RIVERSIDE DRIVE · County 041, Washington · Built 1952 · 2 Lanes · 3,910 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
086159000000000
Year Built
1952
Length
49.8 m (163.4 ft)
Max Span
7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,910
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,204,000
Total Project Cost
$2,408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.