SR 6 over I-5

26.7 E PACIFIC CO · County 041, Washington · Built 1980 · 3 Lanes · 12,275 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0011430B0000000
Year Built
1980
Length
65.2 m (213.9 ft)
Max Span
31.6 m
Width
21.8 m (71.5 ft)
Lanes
3
Daily Traffic
12,275
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,253,000
Total Project Cost
$6,506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.