CHAMBER WAY over I-5
1.1 N JCT SR 6 · County 041, Washington · Built 2018 · 3 Lanes · 12,588 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.675478, -122.975664
This bridge is in worse condition than 6.9% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 8 years old.
Nearby Bridges
CHAMBER WAY over BN RR & N NATL AVE
Built 1952
WEST ST over I-5
Built 1953
I-5 over DILLENBAUGH CREEK
Built 1952
I-5 N-W RAMP over DILLENBAUGH CR
Built 1976
RIVERSIDE DR over DILLENBAUGH CREEK
Built 1952
SR 6 RAMP TO SB I5 over DILLENBAUGH CR
Built 1976
SR 6 over I-5
Built 1980
I-5 over SALZER CREEK
Built 1951
AIRPORT ROAD over SALZER CREEK
Built 1952
N NATIONAL AVE over SALZER CREEK
Built 1936
Bridge Details
- Structure #
- 0018991A0000000
- Year Built
- 2018
- Length
- 39.6 m (129.9 ft)
- Max Span
- 38.7 m
- Width
- 19.8 m (65 ft)
- Lanes
- 3
- Daily Traffic
- 12,588
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,729,000
- Total Project Cost
- $3,458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.